Approach

How we engage

Most clients start with an assessment, run a focused pilot on the findings that matter, and then keep an engineer available as the programme becomes routine.

How we engage
01 — Reliability assessment
01Reliability assessment

4–8 weeks

Reliability assessment

An independent baseline of the facility: systems, dependencies, maintenance programme, data quality, spares position and operating practice.

  • Document and drawing review, CMMS and maintenance-history analysis
  • Site inspection and structured interviews with operations and maintenance staff
  • Criticality screening across the critical power and cooling chain
  • Single-point-of-failure and dependency observations
  • Executive report, risk-ranked findings, 90-day and long-term roadmap

Access to drawings, CMMS export, maintenance history, procedures, and time with your operations team.

02 — Improvement pilot
02Improvement pilot

90 days

Improvement pilot

Take the highest-consequence findings and turn them into engineered, implemented change on a defined scope — one system, one hall or one site.

  • Technical hierarchy and asset register for the pilot scope
  • Criticality analysis and FMEA on the selected systems
  • RCM or PM optimisation producing CMMS-ready task plans
  • Critical-spares and obsolescence review for the same scope
  • Implementation support, acceptance testing and handover to your team

A named owner on your side, a defined scope boundary, and CMMS write access or a data-load window.

03 — Reliability retainer
03Reliability retainer

Ongoing

Reliability retainer

Engineering capacity available against an agreed cadence: analysis of new failures, review of proposed changes, and continuing extension of the programme across the estate.

  • Root-cause analysis on significant incidents and repeat failures
  • Review of maintenance-window plans and methods of procedure
  • Rolling extension of hierarchy, criticality and RCM to further systems
  • KPI and asset-health reporting against your management-review cycle
  • Operational-readiness review for new builds and modifications

An agreed monthly capacity, a standing review meeting, and access to incident and change records.

What an engagement looks like

From evidence to implemented change

1. Scope
Agree boundaries, systems in scope, access requirements and what decisions the work must support.
2. Evidence
Documents, data, site verification and interviews. We work from the facility as it is, not as drawn.
3. Analysis
Criticality, failure modes, dependencies, maintenance effectiveness, data quality and lifecycle position.
4. Decision
Findings risk-ranked and presented so management can choose, defer or fund with the consequences visible.
5. Implementation
Task plans, registers and procedures loaded into your systems, with your team trained to own them.
6. Verification
Effectiveness checks, KPI baselines and a scheduled review so the change survives the engagement.

Discuss scope

Tell us the facility, the systems that concern you, and the decision you are trying to make. We will tell you which engagement fits.