Two obligations shape asset-management practice for data centers in Hong Kong: operational resilience where the facility supports regulated financial services, and statutory energy-efficiency requirements on building services installations.

Regulatory context for Hong Kong facilities

HKMA SPM OR-2 — Operational Resilience

The Hong Kong Monetary Authority's Supervisory Policy Manual module OR-2 sets expectations for authorised institutions to remain within tolerance for disruption to critical operations. Where a data center supports those operations — whether owned by the institution or provided under contract — the facility is part of the resilience picture the institution must be able to evidence.

The practical consequence for a facility team is that availability claims must be supported by mapped dependencies, tested recovery, controlled change and documented third-party arrangements. Criticality analysis, single-point-of-failure registers and maintenance-window governance are the artefacts that make those claims evidential rather than assertive.

Confirm the applicable modules and current expectations with the institution's compliance function; regulatory text is updated periodically.

Buildings Energy Efficiency Ordinance (Cap. 610)

The BEEO requires prescribed building services installations — air-conditioning, electrical, lift and escalator, and lighting — in prescribed buildings to comply with the Building Energy Code, with Form of Compliance and periodic energy audits for central building services installations in commercial buildings.

For a data center, this intersects directly with asset management: the energy performance of chillers, pumps, fans and distribution is both a compliance matter and an operating-cost and capacity matter. Condition and performance data collected for reliability purposes generally serves the audit as well, provided it is structured and retained.

Applicability depends on building classification and installation scope. Verify with your registered energy assessor.

Where this meets our work

We do not provide legal or compliance advice. What we provide is the engineering evidence base these obligations assume exists: an accurate asset register, criticality justified against service consequence, dependency and single-point-of-failure analysis, controlled maintenance and change planning, and reliability data recorded to a consistent taxonomy.

Discuss a Hong Kong facility

Assessment scoping for Hong Kong and Greater Bay Area sites, including the evidence your compliance and customer-audit teams will ask for.